St. Johns Bridge – Broadway Bridge loop from Providence Park
St. Johns Bridge – Broadway Bridge loop from Providence Park
3.0
(8)
97
riders
03:00
39.8km
760m
Mountain biking
Moderate mountain bike ride. Good fitness required. Advanced riding skills necessary. The starting point of the route is accessible with public transport.
Last updated: May 26, 2026
Tips
Includes a movable bridge
Check opening times.
After 37.4 km for 82 m
Waypoints
Start point
Train Station
Get Directions
3.81 km
Portland Heights Facility
Forest
17.3 km
Highlight • Trail
Tip by
25.0 km
Highlight • Viewpoint
Tip by
25.8 km
Highlight • Bridge
Tip by
28.2 km
Highlight • Bridge
Tip by
37.2 km
Highlight • Bridge
Tip by
37.4 km
Highlight • Bridge
Tip by
39.8 km
End point
Train Station
Way Types & Surfaces
Way Types
29.6 km
5.58 km
2.79 km
1.03 km
446 m
358 m
Surfaces
23.1 km
9.35 km
5.33 km
1.83 km
210 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (360 m)
Lowest point (10 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Today
Thursday 2 July
23°C
10°C
0 %
Additional weather tips
Max wind speed: 12.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free