Las Rędziński – Footbridge over Widawa (Under construction) loop from Tarczyński Arena
Las Rędziński – Footbridge over Widawa (Under construction) loop from Tarczyński Arena
29
hikers
02:45
10.8km
20m
Hiking
Moderate hike. Good fitness required. Easily-accessible paths. Suitable for all skill levels. The route includes a crossing by ferry. The starting point of the route is accessible with public transport.
Last updated: August 22, 2026
This route includes a ferry crossing
Tips
Temporary access restrictions
Includes segments with temporary access restrictions.
After 362 m for 138 m
Open: • Monday-Friday: 3:00 PM-7:00 PM • Saturday-Sunday: 9:00 AM-7:00 PM (otherwise closed)
After 10.4 km for 138 m
Open: • Monday-Friday: 3:00 PM-7:00 PM • Saturday-Sunday: 9:00 AM-7:00 PM (otherwise closed)
Waypoints
Start point
Bus stop
Get Directions
587 m
Highlight • Forest
Translated by Google •
Tip by
1.33 km
Highlight • Rest Area
Tip by
5.42 km
Highlight • Bridge
Showing Translation
Tip by
10.8 km
End point
Bus stop
Way Types & Surfaces
Way Types
9.87 km
786 m
119 m
< 100 m
< 100 m
Surfaces
6.46 km
3.49 km
484 m
327 m
< 100 m
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Saturday 29 August
27°C
13°C
42 %
Additional weather tips
Max wind speed: 18.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free