Footbridge over the canal – Bobrzy Stolik loop from Michałów-Grabina
Footbridge over the canal – Bobrzy Stolik loop from Michałów-Grabina
4.8
(4)
94
riders
00:43
17.4km
20m
Road cycling
Easy road ride. Great for any fitness level. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.
Last updated: March 10, 2026
Tips
Your route passes through protected areas
Please check local regulations for:
Warszawski Obszar Chronionego Krajobrazu
Waypoints
Start point
Bus stop
Get Directions
455 m
Highlight (Segment) • Cycleway
Translated by Google •
Tip by
8.70 km
Highlight • Bridge
Translated by Google •
Tip by
9.88 km
Highlight • Bridge
Translated by Google •
Tip by
14.0 km
Highlight • Structure
17.4 km
End point
Bus stop
Way Types & Surfaces
Way Types
16.6 km
560 m
136 m
< 100 m
< 100 m
Surfaces
14.9 km
2.29 km
122 m
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Thursday 7 May
13°C
8°C
-- %
Additional weather tips
Max wind speed: -- km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.