Footbridge Over S3 – Church in Chróścik loop from Gorzów Wielkopolski
Footbridge Over S3 – Church in Chróścik loop from Gorzów Wielkopolski
4.4
(5)
49
riders
02:14
28.8km
300m
Mountain biking
Moderate mountain bike ride. Good fitness required. Advanced riding skills necessary. The starting point of the route is accessible with public transport.
Last updated: August 14, 2026
Tips
Includes a segment in which cycling is not permitted
After 20.7 km for 279 m
Waypoints
Start point
Train Station
5.75 km
Highlight • Bridge
Translated by Google •
Tip by
9.25 km
Highlight • Religious Site
9.26 km
Highlight • Monument
Translated by Google •
Tip by
28.8 km
End point
Train Station
Way Types & Surfaces
Way Types
13.3 km
5.91 km
4.58 km
2.62 km
2.43 km
Surfaces
9.51 km
8.73 km
4.55 km
3.59 km
2.00 km
476 m
Sign up to see more specific route details
Sign up for freeElevation
Highest point (90 m)
Lowest point (20 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Monday 19 October
11°C
6°C
0 %
Additional weather tips
Max wind speed: 15.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.