Graffiti Bridge Underpass – Pockerley Farm Pond loop from Houghton-le-Spring
Graffiti Bridge Underpass – Pockerley Farm Pond loop from Houghton-le-Spring
3.5
(2)
7
riders
03:10
47.5km
520m
Mountain biking
Moderate mountain bike ride. Good fitness required. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: May 27, 2026
Waypoints
Start point
Bus stop
Get Directions
17.2 km
Highlight • Monument
Tip by
18.3 km
Highlight • Monument
Tip by
20.0 km
Highlight • Structure
Tip by
22.1 km
Highlight • Historical Site
Tip by
22.7 km
Highlight • Historical Site
25.0 km
Highlight • Lake
Tip by
30.3 km
Highlight • Structure
Tip by
41.1 km
Highlight • MTB Park
Tip by
41.9 km
Biddick Gill Wood
Forest
42.8 km
Biddick Woods
Forest
47.5 km
End point
Bus stop
Way Types & Surfaces
Way Types
20.4 km
11.1 km
11.0 km
4.23 km
544 m
316 m
Surfaces
27.5 km
9.05 km
8.46 km
1.36 km
1.13 km
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (150 m)
Lowest point (0 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Wednesday 15 July
20°C
11°C
0 %
Additional weather tips
Max wind speed: 14.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free