Alwen Reservoir Wooden Bridge – Alwen Dam loop from Llyn Brenig Visitor Centre
Alwen Reservoir Wooden Bridge – Alwen Dam loop from Llyn Brenig Visitor Centre
43
riders
02:16
25.2km
270m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is right next to a parking lot.
Last updated: May 21, 2026
Waypoints
Start point
Parking
Get Directions
6.84 km
Highlight • Lake
Tip by
7.82 km
Highlight • Cycleway
Tip by
8.51 km
Highlight • Lake
Tip by
8.85 km
Highlight • River
11.4 km
Highlight (Segment) • Trail
Tip by
13.3 km
Highlight • Monument
Tip by
14.1 km
Highlight • Cycleway
15.1 km
Alwen Reservoir
Lake
17.0 km
Highlight • Lake
20.1 km
Hafod Elwy National Nature Reserve
Nature Reserve
25.2 km
End point
Parking
Way Types & Surfaces
Way Types
10.4 km
7.93 km
5.93 km
899 m
< 100 m
Surfaces
19.5 km
3.32 km
2.39 km
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (430 m)
Lowest point (360 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Thursday 25 June
27°C
17°C
19 %
Additional weather tips
Max wind speed: 30.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free