Bridge over the Wkra in Joniec – Nowe Miasto Pier loop from Gołotczyzna
Bridge over the Wkra in Joniec – Nowe Miasto Pier loop from Gołotczyzna
3
riders
02:45
63.7km
210m
Road cycling
Moderate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.
Last updated: April 17, 2026
Tips
The surface for a segment of your route may not be suitable
Some segments of your route comprise a surface that may not be suitable for your chosen sport.
After 42.3 km for 180 m
Waypoints
Start point
Train Station
Get Directions
14.3 km
Highlight • Historical Site
Translated by Google •
Tip by
37.8 km
Highlight • Cycleway
38.7 km
Highlight • Bridge
Translated by Google •
Tip by
42.3 km
Highlight • Trail
47.5 km
Highlight • Bridge
Translated by Google •
Tip by
63.7 km
End point
Train Station
Way Types & Surfaces
Way Types
52.1 km
10.7 km
538 m
348 m
< 100 m
Surfaces
45.1 km
17.5 km
624 m
408 m
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (140 m)
Lowest point (80 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Monday 13 July
25°C
13°C
0 %
Additional weather tips
Max wind speed: 9.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free