Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Login or Signup

Routes
United States
California
Contra Costa County
Walnut Creek

Iron Horse Trail – Iron Horse Trail bridge loop from Walnut Creek

Routes
United States
California
Contra Costa County
Walnut Creek

Iron Horse Trail – Iron Horse Trail bridge loop from Walnut Creek

Moderate

5.0

(9695)

14,327

riders

Iron Horse Trail – Iron Horse Trail bridge loop from Walnut Creek

01:52

28.3km

320m

Gravel riding

Moderate gravel ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.

Last updated: April 20, 2026

Tips

Your route passes through a protected area

Please check local regulations for:

Mount Diablo State Park

Waypoints

A

Start point

Train Station

Get Directions

1

1.85 km

Iron Horse Trail

Highlight (Segment) • Cycleway

The Iron Horse Trail is a 32-mile multi-path that connects the towns of Concord and Pleasanton. It follows the route of the abandoned Southern Pacific Railroad. With its access to …

Tip by

2

2.75 km

Iron Horse Trail

Highlight (Segment) • Cycleway

The Iron Horse Trail is a 32-mile multi-path that connects the towns of Concord and Pleasanton. It follows the route of the abandoned Southern Pacific Railroad. With its access to …

Tip by

3

8.29 km

Best Trans-Contra Costa car-free bike route to access the park trails

Tip by

4

17.8 km

Briones to Mount Diablo Regional Trail

Highlight (Segment) • Trail

Gravel at its best. This road is a paradise for gravel bikers and novices on a mountain bike.

Tip by

5

19.1 km

Briones to Mount Diablo Regional Trail

Highlight (Segment) • Trail

Gravel at its best. This road is a paradise for gravel bikers and novices on a mountain bike.

Tip by

21.8 km

Shell Ridge Open Space

Nature Reserve

7

26.8 km

Iron Horse Trail Overcrossing

Highlight • Bridge

A pedestrian bridge to cross over Ygnacio Valley Road.

Tip by

8

27.0 km

Iron Horse Trail bridge

Highlight • Bridge

The old railway bridge crosses Walnut Creek and continues its service to the bikers and pedestrians along the Iron Horse Regional Trail.

Tip by

B

28.3 km

End point

Train Station

Loading

Way Types & Surfaces

Way Types

12.3 km

8.80 km

4.13 km

2.78 km

193 m

< 100 m

Surfaces

12.5 km

8.34 km

6.77 km

737 m

< 100 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Highest point (260 m)

Lowest point (40 m)

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Thursday 7 May

24°C

11°C

0 %

Additional weather tips

Max wind speed: 17.0 km/h

to get more detailed weather forecasts along your route

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Nearby routes

Hard

13

East Bay Skyline and Berkeley Hills Loop

04:26h

54.9km

1,040m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy