Jamsu Bridge South End – Nanji Hangang Park loop from 강동구청
Jamsu Bridge South End – Nanji Hangang Park loop from 강동구청
4.7
(12)
199
riders
06:45
119km
350m
Cycling
Hard bike ride. Very good fitness required. Mostly paved surfaces. The starting point of the route is accessible with public transport.
Last updated: November 7, 2026
Tips
Includes a segment in which cycling is not permitted
After 108 km for 61 m
Waypoints
Start point
Train Station
1.01 km
Seongnaecheon Stream
Lake
2.40 km
Highlight (Segment) • Cycleway
Tip by
8.20 km
Highlight • Viewpoint
14.1 km
Highlight • Bridge
25.9 km
Highlight • Bridge
28.3 km
Highlight • Rest Area
Tip by
59.5 km
Highlight • Rest Area
59.8 km
Highlight • Rest Area
Tip by
80.4 km
Highlight • Rest Area
Tip by
108 km
Bay
Bay
119 km
End point
Train Station
Way Types & Surfaces
Way Types
116 km
1.33 km
1.16 km
< 100 m
< 100 m
< 100 m
< 100 m
Surfaces
111 km
7.12 km
333 m
293 m
160 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Monday 16 November
17°C
9°C
-- %
Additional weather tips
Max wind speed: -- km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.